Length: 2 Days
Print Friendly, PDF & Email

Introduction to NERC Facility Interconnection Requirements Training by Tonex

This comprehensive training, “Introduction to NERC Facility Interconnection Requirements,” offered by Tonex, delves into the critical aspects of NERC (North American Electric Reliability Corporation) Facility Interconnection Requirements. Participants will gain a profound understanding of the regulatory landscape and essential guidelines governing the interconnection of facilities within the electric power sector.

Learning Objectives:

  • Grasp the fundamental principles and objectives of NERC Facility Interconnection Requirements.
  • Navigate through the regulatory framework and compliance standards applicable to facility interconnections.
  • Analyze case studies and real-world scenarios to apply theoretical knowledge to practical situations.
  • Develop proficiency in assessing and mitigating risks associated with facility interconnections.
  • Gain insights into the evolving landscape of NERC standards and their impact on the power industry.
  • Acquire the skills to ensure seamless compliance with NERC Facility Interconnection Requirements.

Audience: This course is tailored for professionals in the electric power sector, including engineers, project managers, regulatory compliance officers, and anyone involved in the planning, design, and operation of power facilities. It is suitable for both newcomers seeking foundational knowledge and seasoned practitioners looking to stay abreast of the latest regulatory developments.

Course Outline:

Module 1: Introduction to NERC

    • NERC’s Role and Mission
    • Significance in Power Grid Reliability
    • Regulatory Framework Overview
    • Key Players in NERC Compliance
    • Historical Context of NERC Standards
    • Emerging Trends in Power Industry Regulation

Module 2: NERC Standards for Facility Interconnection

    • Overview of Applicable Standards
    • Requirements for Facility Interconnections
    • Classification of Interconnected Facilities
    • Navigating Compliance Documentation
    • Recent Updates to NERC Standards
    • Implications of Non-Compliance

Module 3: Regulatory Landscape

    • Federal Regulations Impacting Facility Interconnection
    • State-Level Considerations
    • Interaction with Other Regulatory Bodies
    • Regulatory Compliance Challenges
    • Regulatory Reporting Obligations
    • Regulatory Changes and Updates

Module 4: Technical Considerations

    • Planning and Design Considerations
    • System Integration Challenges
    • Grid Impact Studies
    • Interconnection Feasibility Assessment
    • Technical Compliance Requirements
    • Addressing Technological Advancements

Module 5: Compliance Best Practices

    • Establishing a Compliance Framework
    • Documentation and Record-Keeping Best Practices
    • Training and Awareness Programs
    • Continuous Monitoring Strategies
    • Proactive Compliance Audits
    • Industry Collaboration for Compliance Solutions

Module 6: Case Studies and Practical Applications

    • Review of Real-World Facility Interconnection Cases
    • Analyzing Successful Compliance Strategies
    • Lessons Learned from Compliance Failures
    • Simulated Scenario Analysis
    • Interactive Problem-Solving Exercises
    • Group Discussions on Practical Implementation Challenges

 

Request More Information

Please enter contact information followed by your questions, comments and/or request(s):
  • Please complete the following form and a Tonex Training Specialist will contact you as soon as is possible.

    * Indicates required fields

  • This field is for validation purposes and should be left unchanged.

Request More Information

  • Please complete the following form and a Tonex Training Specialist will contact you as soon as is possible.

    * Indicates required fields

  • This field is for validation purposes and should be left unchanged.