| Essentials for NERC Critical Infrastructure Protection Training |
2 days |
| Interconnection Reliability Operations and Coordination (IRO) |
2 days |
| Introduction to Cyber Security — Incident Reporting and Response Planning |
2 days |
| Introduction to NERC Resource and Demand Balancing (BAL) |
2 days |
| Introduction to NERC Balancing Authority Control |
2 days |
| Introduction to NERC CIP Security Awareness Workshop |
2 days |
| Introduction to NERC Communications Reliability |
2 days |
| Introduction to NERC Communications (COM) |
2 days |
| Introduction to NERC Contingency Reserve |
2 days |
| Introduction to NERC Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection |
2 days |
| Introduction to NERC Cyber Security - Information Protection |
2 days |
| Introduction to NERC Cyber Security - Personnel & Training |
2 days |
| Introduction to NERC Cyber Security - Physical Security of BES Cyber Systems |
2 days |
| Introduction to NERC Cyber Security - Recovery Plans for BES Cyber Systems |
2 days |
| Introduction to NERC Cyber Security - Supply Chain Risk Management |
2 days |
| Introduction to NERC Cyber Security - System Security Management |
2 days |
| Introduction to NERC Cyber Security – Communications between Control Centers |
2 days |
| Introduction to NERC Cyber Security — Bulk Electric System (BES) Cyber System Categorization |
2 days |
| Introduction to NERC Cyber Security — Configuration Change Management and Vulnerability Assessments |
2 days |
| Introduction to NERC Cyber Security — Electronic Security Perimeter(s) |
2 days |
| Introduction to NERC Cyber Security — Security Management Controls |
2 days |
| Introduction to NERC Data for Power System Modeling and Analysis |
2 days |
| Introduction to NERC Demand and Energy Data |
2 days |
| Introduction to NERC Disturbance Control Standard - Contingency Reserve for Recovery from a Balancing Contingency Event |
2 days |
| Introduction to NERC Disturbance Monitoring and Reporting Requirements |
2 days |
| Introduction to NERC Emergency Preparedness and Operations (EOP) |
2 days |
| Introduction to NERC Event Reporting |
2 days |
| Introduction to NERC Extreme Cold Weather Preparedness and Operations |
2 days |
| Introduction to NERC Facilities Design, Connections, and Maintenance (FAC) |
2 days |
| Introduction to NERC Facility Interconnection Requirements |
2 days |
| Introduction to NERC Filed and Pending Regulatory Approval |
2 days |
| Introduction to NERC Frequency and Voltage Protection Settings for Generating Resources |
2 days |
| Introduction to NERC Generator Operation for Maintaining Network Voltage Schedules |
2 days |
| Introduction to NERC Implementation and Documentation of Underfrequency Load Shedding Equipment Maintenance Program |
2 days |
| Introduction to NERC Interchange Scheduling and Coordination (INT) |
2 days |
| Introduction to NERC Modeling, Data, and Analysis (MOD) |
2 days |
| Introduction to NERC Nuclear |
2 days |
| Introduction to NERC Nuclear Plant Interface Coordination |
2 days |
| Introduction to NERC Operating Personnel Communications Protocols |
2 days |
| Introduction to NERC Operational Reliability Data |
2 days |
| Introduction to NERC Operations Personnel Training |
2 days |
| Introduction to NERC Operations Planning |
2 days |
| Introduction to NERC Outage Coordination |
2 days |
| Introduction to NERC Personnel Performance, Training, and Qualifications (PER) |
2 days |
| Introduction to NERC Physical Security |
2 days |
| Introduction to NERC Planning Resource Adequacy Analysis, Assessment and Documentation |
2 days |
| Introduction to NERC Protection and Control (PRC) |
2 days |
| Introduction to NERC Protection System Misoperation Identification and Correction |
2 days |
| Introduction to NERC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance |
2 days |
| Introduction to NERC Qualified Path Unscheduled Flow (USF) Relief |
2 days |
| Introduction to NERC Rated System Path Methodology |
2 days |
| Introduction to NERC Real Power Balancing Control Performance |
2 days |
| Introduction to NERC Real-time Reliability Monitoring and Analysis Capabilities |
2 days |
| Introduction to NERC Relay Performance During Stable Power Swings |
2 days |
| Introduction to NERC Reliability Coordination – Monitoring and Analysis, Responsibilities and Transmission Loading Relief (TLR) |
2 days |
| Introduction to NERC Reliability Coordinator Data and information Specification and Collection |
2 days |
| Introduction to NERC Reliability Coordinator Data Specification and Collection |
2 days |
| Introduction to NERC Reliability Coordinator Operational Analyses and Real-time Assessments |
2 days |
| Introduction to NERC Remedial Action Scheme Maintenance and Testing |
2 days |
| Introduction to NERC Steady-State and Dynamic System Model Validation |
2 days |
| Introduction to NERC System Operating Limits Methodology for the Operations Horizon |
2 days |
| Introduction to NERC System Operating Limits Methodology for the Planning Horizon |
2 days |
| Introduction to NERC System Restoration Coordination |
2 days |
| Introduction to NERC System Restoration from Blackstart Resources |
2 days |
| Introduction to NERC Transmission and Generation Protection System Maintenance and Testing |
2 days |
| Introduction to NERC Transmission Operations and Maintenance |
2 days |
| Introduction to NERC Transmission Operations (TOP) |
2 days |
| Introduction to NERC Transmission Operator and Balancing Authority Data and Information Specification and Collection |
2 days |
| Introduction to NERC Transmission Planning (TPL) |
2 days |
| Introduction to NERC Transmission Relay Loadability |
2 days |
| Introduction to NERC Transmission Reliability Margin Calculation |
2 days |
| Introduction to NERC Transmission System Planning Performance Requirements |
2 days |
| Introduction to NERC Transmission Vegetation Management |
2 days |
| Introduction to NERC Undervoltage Load Shedding |
2 days |
| Introduction to NERC Undervoltage Load Shedding System Maintenance and Testing |
2 days |
| Introduction to NERC Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability |
2 days |
| Introduction to NERC Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions |
2 days |
| Introduction to NERC Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions |
2 days |
| Introduction to NERC Voltage and Reactive Control |
2 days |
| Introduction to NERC Voltage and Reactive (VAR) |
2 days |
| NERC Automatic Time Error Correction – Introduction |
2 days |
| NERC Automatic Underfrequency Load Shedding |
2 days |
| NERC Capacity Benefit Margin |
2 days |
| NERC Critical Infrastructure Protection (CIP) Bootcamp |
2 days |
| NERC Emergency Preparedness and Operations |
2 days |
| NERC System Operator Certification Training |
2 days |
| NERC Transmission System Capability |
2 days |